{"id":1368,"date":"2023-05-19T13:22:24","date_gmt":"2023-05-19T18:22:24","guid":{"rendered":"https:\/\/butlermfg2023.wpengine.com\/?page_id=1368"},"modified":"2024-04-01T16:26:38","modified_gmt":"2024-04-01T21:26:38","slug":"heavy-structures","status":"publish","type":"page","link":"https:\/\/www.butlermfg.com\/building-products-systems\/building-solutions\/heavy-structures\/","title":{"rendered":"Heavy Structures"},"content":{"rendered":"\t\t
Butler Heavy Structures provide inspired solutions for complex structures. We integrate structural design with Butler pre-engineered metal building systems, delivering both strength and economy.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
Whatever your industry, Butler Heavy Structures is the perfect solution for:<\/p>
If you need a new facility quickly, take advantage of the flexibility offered by the Butler Tier II Classic building system.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
Butler Heavy Structures partners with you before construction to provide conceptual design and estimating that takes all aspects of the project into account (including foundation and erection costs) to give you an accurate picture of your investment.<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t We provide complete design services for the building shell package, take responsibility for the fabrication of all building components included in our scope of work, and coordinate delivery of materials to the job site.<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t This aircraft hangar is the largest in the world for the US Navy. To meet the Navy\u2019s demand for multiple openings for various aircraft, clear spans of 455′ and 428′ were necessary at the front of the hangar.\u00a0To achieve these record-setting clear spans, Butler Heavy Structures utilized three-story-tall box trusses.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t Known as the JetBlue Technical Operations Campus, this 100,000 sq. ft. facility located at John F. Kennedy International airport provides space for offices, workshops, and a state-of-the-art automated parts retrieval and storage system.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\tDesign, Fabrication & Delivery<\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Featured Butler Heavy Structures Projects<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
Jacksonville Naval Air Station<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
General Electric Company Corporate Hangar<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Solid Waste Authority of Palm Beach County Renewable Energy Facility 2<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Southwest Airlines Maintenance Hangar<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
New York Giants Practice Facility<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
McDermott Fabrication Facility<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Tinker Air Force Base Bldg 2283 Multi-Bay Hangar<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Men in Black\u2122 Alien Attack\u2122<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
JetBlue Airways Hangar<\/a><\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t